Split
The original thick slab is divided into two sections.
Home · Process
Northland Ancient Kauri · Made in Tauranga
A 25 second view of the actual build, from the split Ancient Kauri slab and recomposed live edges through preparation, the black resin river, finishing and final assembly.
Actual build
The actual making process for a New Zealand made Ancient Kauri River Table by Wolffmark in Tauranga.
Build sequence
The video and sequence document the actual Wolffmark build rather than a recreation.
The original thick slab is divided into two sections.
The timber is stabilised and prepared before the centre is formed.
The original live edges are turned inward to create the central river.
The top is flattened, refined, finished and set on its raw New Zealand fabricated steel base.